Pole selector

Pole
SiteWhat the terrain categories mean

Enter the 3-second gust at 10 m above open, flat country, as your project specification or the national wind map gives it. Between two steps, choose the next step up. Wind above 200 km/h or a height other than 4, 5, 6, 7, 8, 9, 10, 12 m is sized individually in our quotation.

For the quote

Selected pole

4 m5 m6 m7 m8 m9 m10 m12 mChoose a heightto start the drawing

Still to choose: power supply, height, luminaires, pole top, wind speed, terrain.

Top diameter
Base diameter
Wall
Weight, galvanized
Shape and steel
Octagonal, S235, diameters across flats
Base plate
Anchor bolts
Shaft to plate weld
Utilisation in our table
Top deflection, class 2 limit

The pole sizes on this page are pre-selected from a table calculated by Mir Group, based on EN 40-3-1, EN 40-3-3 and EN 1991-1-4, for standard octagonal S235 steel poles carrying our luminaires, using the wind class and terrain you choose. They are for preliminary selection and quotation only. They are not a structural design for a specific site. Wind speed, terrain, soil, foundation and local regulations must be confirmed by a qualified engineer for each project. Final dimensions are confirmed in our quotation.

Terrain categories

CategoryTerrainz0 (m)zmin (m)
0Sea or coastal area exposed to the open sea0.0031
ILakes, or flat land with no obstacles0.011
IILow vegetation, isolated obstacles (open country)0.054 *
IIISuburbs, villages, industrial areas0.35
IVCity centres, at least 15 % of the area built over 15 m110

* EN 1991-1-4 Table 4.1 gives 2 m for category II. The table uses 4 m, the value of our project calculations, which gives a higher wind load on the lowest 4 m of the pole and is on the safe side.

How the table is made

  1. Wind. The 3-second gust you choose is the value at 10 m above open, flat country. The table divides it by 1.45 to get the 10-minute mean wind that EN 1991-1-4 works with, then applies the terrain category you choose for the height of the pole. Winds come in 20 km/h steps from 100 to 200 km/h: for a value between two steps, the next step up is on the safe side.
  2. Loads. Wind on the shaft, the top unit and each arm luminaire from that wind and the terrain category, with the loads of EN 40-3-1 and the shape factors of EN 1991-1-4. The terrain roughness and minimum height come from the EU Joint Research Centre handbook on EN 1991-1-4 (JRC Handbook 3); category II uses the values of our project calculations, which are on the safe side.
  3. Checks. Bending and torsion of every section along the height and at the door opening (EN 40-3-3), with the second-order effect of the deflection, and the top deflection within the class 2 limit of EN 40-3-1: 0.06 × (height + half the arm length). Shaft, door section and arm tube are used to at most 90 % of their resistance. The base plate, its four anchor bolts and the weld are checked for the same loads, also to at most 90 %.
  4. Selection. All 3,840 combinations of power supply, height, luminaires, pole top, wind speed and terrain are solved in advance: top diameter 60 to 160 mm (80 mm or more under a top unit), wall 3 to 6 mm. The passing section with the lowest galvanized weight is shown first as Recommended, with up to two other passing sections that weigh more.
  5. Weights. The weights cover the shaft, base plate, four gussets and arm tubes; galvanized weight adds the minimum zinc coating of ISO 1461. Door frame and stiffener bars, cap, brackets and anchor bolts are not included. The all-in-one top units take a 60 or 76 mm spigot; the shaft top under a top unit is 80 mm or more, wider than the spigot, so the top fitting is agreed and priced in the quotation.

The foundation is not part of the table: it depends on the soil and is designed for each project.

Standards cited by name: EN 40-3-1, EN 40-3-3, EN 1991-1-4, ISO 1461. Free source: EU JRC, Eurocode 1 wind actions handbook. Table calculated on 2026-11-15.